0601 - Bell Memorial

RFP for Design Build
Request for Proposal - Clarifications
General Conditions of Design Build Agreement
Design Build Agreement
Outline Specifications
Floor Plan / Site Plan / Soils
Survey: Page 1   Page 2
Pre-Proposal Meeting Attendees (6-7-2006)
Pre-Proposal Meeting Notes (6-7-2006)
Scope Of Work Clarifications (7-19-2006)
Scope Of Work Clarifications (8-1-2006)
Exist Clinic Remodel Work (8-3-2006)
 
 
Preliminary Building Drawings
1st FLOOR
2nd FLOOR
Basement
Clinic Building
Exterior
Interior
Main Entry
Site (enlarged)